The hydrogen-generation system set to power bp’s Lingen project will consist of 20 PEM HyLYZER®-1000 electrolyzer units — the largest electrolyzer system assembled by Accelera to date — and is being manufactured in Accelera’s new electrolyzer plant in Gaualajara, Spain. Once fully commissioned in 2027, the 100 MW electrolyzer system will produce up to 11,000 tons of green hydrogen per year.