The Ministry of Power has clarified that energy obtained through open access arrangements, either through a third-party supplier or captive generation, will not constitute a part of the permissible capacity of banked energy.
The Ministry of Power has clarified that energy obtained through open access arrangements, either through a third-party supplier or captive generation, will not constitute a part of the permissible capacity of banked energy.