The design will combine two of our NEPTUNE V plug-and-play 5MW containerised electrolyser systems. NEPTUNE V utilises ITM’s leading and proven TRIDENT stack technology.
The UK has ambitious targets for producing green hydrogen, with the aim of 6GW installed capacity by 2030, aided by the Hydrogen Allocation Rounds (HAR). HAR2, for example, aims to support up to 875MW of capacity